Baldivis

Avena Garden Reserve – New play equipment
The play area will be closed until approximately 18 May 2018 during installation of the new play equipment.

Barri Barri Reserve – Baldivis off leash dog exercise area
Access will be restricted to the construction area until the official opening on 18 July 2018 (weather permitting).

Gunnedah Reserve – Drainage upgrade
Three (3) existing drainage bubble-up pits will be replaced within Gunnedah Reserve. Residents are advised to avoid this reserve while the works are underway. Works are expected to be completed by 19 May 2018.

Mundijong Road / St Albans Road – Road Widening for a new right turn lane (eastbound)
The eastbound lane of Mundijong Road will be closed during working hours (approx. 7:00am to 3:00pm) with a “stop/go” arrangement in place to allow Mundijong Road traffic (both directions) to travel through the site. There will be some delays to through traffic. The eastbound lane of Mundijong Road will be open outside of these working hours; however, the site will be under traffic management with a reduced speed.

Nairn Drive – Blaxland Terrace to Cottonwood Drive Second carriageway construction
Works will recommence in May 2018 and the existing carriageway adjacent to the worksite will remain under traffic management (40km/hr zone).

 

Rockingham

Phoebe Hymus Reserve – Play equipment replacement
The existing play equipment at this location is scheduled to be removed and replaced with new equipment. The play area will be closed for the duration, expected to be from 7 May to 12 May 2018.

Rockingham Beach Foreshore – Western Power Substation
Footpath along Rockingham Beach Road will be closed on 15 and 16 May. Intermittent delays may occur for motorists and cyclists on these days.

 

Safety Bay

Fantasy Park – Play equipment replacement
Selected play equipment at this location is scheduled to be removed and replaced with new equipment, including rubber softfall. The play area will be closed for the duration, expected to be from 5 May to 18 May 2018.

Safety Bay Bowling Club – Toilet refurbishment
Works have commenced and will be completed before end of June 2018. There are temporary toilet facilities provided and the Club will remain open during these works.

Short Street – Dual Use Footpath Safety Bay Road to Warnbro Beach Road
Intermittent delays may occur for motorists, cyclists and pedestrians. Works are expected to be completed by 11 May 2018.

 

Secret Harbour

Mandalay Reserve – New play equipment
The play area will be closed until approximately 11 May 2018 during installation of the new play equipment.

Secret Harbour Foreshore – All Abilities Playground
Works have commenced and the site is fenced off. Public access is available between the carparks at Palisades Boulevard and Palermo Cove, on the eastern side of the site following the footpath. Scheduled completion is May 2018. Carparks remain open.

 

Shoalwater

Baybreeze Promenade/Oceanrunner Boulevard Reserve – New play equipment
The play area will be closed during installation, we are expecting this to be closed from 14 May to 18 May 2018.

 

Singleton

Singleton Foreshore – New play equipment
The play area will be closed during installation which is expected to occur from 5 May to 18 May 2018.

 

Waikiki

Waikiki Foreshore – Boundary Fencing
Boundary fence is being installed along the foredune between Capella Pass and St Ives car parks. Contractors will be transporting materials down the Capella Pass beach access path. However, public access to be beach will remain open during this time. Installation is expected to be completed by 12 May 2018.

 

 